LCA Tejas/Variants

Tejas variants.

One airframe family, five paths: the Mk1 flying with the IAF, the Mk1A on order, the larger Mk2 in development, the twin-seat trainer, and the naval prototypes that proved carrier operations.

Last updated 26 Sep 2026 5 variants
Photo: Ministry of Defence, Govt of India (GODL)
Mk1 delivered
40
32 fighters + 8 trainers
Mk1A on order
180
83 (2021) + 97 (2025)
Mk1A first deliveries
2026target
End of year, per HAL
Mk2
2027target
First flight, per reports
01Tejas Mk1

In service

In service · order complete

The Mk1 is the version the Indian Air Force flies today. It was ordered in two batches of 20 — an Initial Operational Clearance (IOC) standard batch and a Final Operational Clearance (FOC) standard batch, the latter adding air-to-air refuelling and beyond-visual-range missiles.

HAL handed over the last two twin-seat trainers on 18 September 2026, completing the order: 40 aircraft — 32 fighters and 8 trainers.1 The fleet flies with No. 45 Squadron "Flying Daggers" and No. 18 Squadron "Flying Bullets".

02Tejas Mk1A

Next in line

180 on order · deliveries from end-2026

The Mk1A keeps the Mk1's airframe and GE F404-IN20 engine but upgrades what matters in combat: an AESA radar, a new electronic-warfare self-protection suite, and easier maintenance.

  • First order — 83 aircraft (73 fighters, 10 trainers), signed in February 2021.
  • Second order — 97 aircraft (68 fighters, 29 twin-seaters), signed on 25 September 2025 for ₹62,370 crore. This batch gets the indigenous UTTAM AESA radar and the Swayam Raksha Kavach EW suite, with over 64% indigenous content; deliveries run from 2027-28 over six years.2

Where production stands (September 2026): HAL has 27 Mk1A airframes built and is completing radar and weapons integration as GE engine deliveries ramp up. The first handovers to the IAF are targeted for around the end of 2026.3

To speed up production, HAL opened a third Tejas line at Nashik on 17 October 2025, raising capacity to 24 aircraft a year.4 No. 3 Squadron "Cobras", a former MiG-21 unit, is widely reported to be the first Mk1A squadron.

Tejas Mk1A LA-5043, the first built at HAL Nashik, on the flight line
The first Nashik-built Mk1A, LA-5043, on 17 October 2025.Photo: PIB / Ministry of Defence
03Tejas Mk2

Bigger, in development

In development · first flight targeted 2027

Despite the name, the Mk2 is effectively a new, larger medium-weight fighter: longer, heavier, with close-coupled canards and the more powerful GE F414-INS6 engine. Design targets include a maximum take-off weight of about 17.5 tonnes, 11–13 hardpoints (reports vary) and a 6.5-tonne weapons load.5

HAL targets engine ground runs in March 2027 and a first flight by mid-2027.5

04Twin-seat trainer

Two seats, full capability

The twin-seater adds a second cockpit for conversion training while keeping the fighter's systems. Eight Mk1 trainers are in service. Twin-seat trainers are part of both orders — 10 in the 2021 contract and 29 Mk1A twin-seaters in the 2025 contract.1,2

06Sources

Sources

  1. ThePrint — HAL hands over final two Tejas Mk1 trainers, Sep 2026. theprint.in
  2. PIB — MoD signs contract with HAL for 97 LCA Mk1A, 25 Sep 2025. pib.gov.in
  3. The Week — Tejas Mk1A delivery status, 18 Sep 2026. theweek.in
  4. PIB — Third LCA Mk1A production line inaugurated at HAL Nashik, 17 Oct 2025. pib.gov.in
  5. HAL Tejas Mk2 (design data and programme status). en.wikipedia.org
  6. PIB — LCA Navy lands on INS Vikrant, 6 Feb 2023. pib.gov.in
  7. HAL TEDBF (programme status). en.wikipedia.org
  8. PIB — India–France agreement for 26 Rafale-M, Apr 2025. pib.gov.in
Keep exploring